Explore Heritage

Call 07563 819258 Get a free quotation

FARSLEY · LS28 · HERITAGE PAVING

Dropped kerbs in Farsley

Dropped kerb installers in Farsley. Council application guidance, Section 171 paperwork and installation from our nearby Pudsey-based team.

NRSWA street works qualified£10m public liability cover
Heritage Paving van beside a tarmac hot box on site
Heritage van and tarmac hot box on site.

LEEDS CITY COUNCIL APPLICATION

Apply for your Farsley dropped kerb first.

The first step is the council’s vehicle-crossing application and site inspection. Initial approval is followed by the contractor’s Section 171 licence application. We can help you understand the process; approval is the council’s decision.

Apply for dropped kerb permission

Opens the Leeds City Council form in a new tab. For driveway access, request a vehicular crossing site inspection. Read the council’s guidance and current fees before applying.

Connect your Farsley driveway to the road properly.

A finished driveway needs an approved route across the pavement. If you are changing your Farsley entrance or creating new parking, we can assess the crossing alongside the paving, gate opening and boundary work.

Our Farsley portfolio includes tarmac, Sorrento paving and walling. We can use those examples when planning the private frontage; the dropped kerb itself must meet the council-approved design and highway specification.

We take enquiries from Farsley and neighbouring Pudsey, Stanningley and Calverley. Your full address helps us identify the proposed access accurately.

Explore our driveway services in Farsley

Check the boundary before moving walls or gates.

Send photographs showing both sides of the entrance and the full pavement width. We look for visible obstructions and check whether the planned crossing lines up with the usable parking area. Any relocation of street furniture or services needs agreement with the responsible body and may involve additional costs.

Dropped kerb installation in Farsley

  1. Documents and planningWe prepare the contractor’s licence paperwork and supply relevant qualification and insurance documents.
  2. Prepare the siteArrange the required site protection, check underground services and excavate to the approved construction.
  3. Kerbs and reinstatementInstall lowered and transition kerbs with suitable support, prepare the foundation and reinstate the footway to the council-approved specification.

Planning permission is separate and may also be required. No highway excavation starts until the necessary permissions and licence are in place.

Dropped kerb costs in Farsley.

The quote depends on crossing width, pavement construction, excavation, reinstatement and any obstructions. Council inspection and licence fees are separate from construction costs unless expressly included in your quote. We explain the scope and any known additional work before you decide.

Farsley dropped kerbs: your questions.

Can you coordinate a Farsley entrance wall and dropped kerb?

Yes. We can include the private boundary work in the overall design and quote, while keeping council approval and the highway licence separate. Do not assume that moving a wall means a wider crossing will be approved.

Can you handle the Section 171 application?

Yes. After initial vehicle-crossing approval, we can prepare and submit the contractor application, provide our relevant street works and insurance documents, and liaise with Leeds City Council.

Does sending the application mean permission is granted?

No. The council assesses the proposal and may ask for further information or permissions. Wait for the required approvals before arranging highway work.

More for your Farsley frontage.

FREE SITE QUOTATION · FARSLEY

Let’s look at your entrance.

Send your Farsley address and a few photographs. We’ll discuss the work and arrange the next step.

5.0 53 Google reviewsCallWhatsAppGet a quote